Blog Post #4
This week for my Genius Hour Project all I needed to do was hang the door. I started by measuring how high I needed the door to hang and then measuring up from the highest point of the floor (I own a old house so the floor is not perfectly flat). I then measured and marked the height of the track system the door would hang on. Next I measured how high i needed the wheels and brackets to sit on the door and drilled pilot holes in the door to attach the brackets and wheels. Next I went to hang the track, however the first stud i found turned out to be spaced oddly so none of my remaining screws hit studs meaning I needed to remove them and start over again. I found another stud and re-hung the track properly by making sure the studs were properly spaced out and using a level to ensure it was straight so the door would not roll on its own. I then filled the initial holes and painting over them. After properly securing the track all that was left was to mount the door on...